Lorries leaving Romania through the Giurgiu-Ruse border crossing point (PTF) are queuing up eight kilometres on the first lane of the national road DN 5 Bucharest-Giurgiu waiting two hundred minutes for checking, while traffic in the area is guided by traffic police on the national road and by local police crews at the entrance to Giurgiu towards the border point.
According to the Giurgiu Border Police Inspectorate (ITPF), in the last 24 hours a very large number of lorries were transiting through, which increased the waiting time for checking.
The lorries transiting through the Giurgiu border point are using five traffic arteries at the check point, but the day before about 1,300 lorries arrived both through the entry and through the exit areas, but on ordinary days the traffic is approximately 800 lorries in 24 hours.
According to the Border Police, the waiting time for lorries exiting Romania through PTF Giurgiu is two hundred minutes, while those entering the country have to wait 60 minutes.
For cars, the waiting time is 20 minutes both in and out of Romania through PTF Giurgiu.
Lorries leaving Romania via Giurgiu waiting 200 minutes at checkpoint
Articole Similare

6
Nicusor Dan says investment guarantee fund in Moldova should be created after overcoming budget difficulties
6

7
Bucharest Stock Exchange closes higher Tuesday's session
7

11
There are significant areas, central and local institutions, where layoffs are necessary
11

15
President Dan: I will make sure next SRI head makes combating Russian interference a priority
15

11
Former PM Tariceanu reacts to President Dan's statement, says Romania was perfectly ready to join EU
11

12
There is a rift between state and private sector that we must repair (President Dan)
12

6
President Dan: I would bet that Moldova will be a member of the EU in three years' time
6

9
Bucharest Stock Exchange shows revival as companies signal intent to list, says chairman Hanga
9

16
Ministry of Labor receives commitment credits of 100 million RON for In Vitro Fertilization Program
16

12
Population connected to public water supply system reaches 14.782 million people in 2024
12

23
Arad: Boiling magiun, a tradition that unites the community, revived in village of Turnu
23

24
Royal Foundation outlines vision for Beautiful Old Age, ranks seniors' needs, solutions
24

49
Neamt: Multipurpose Hall in Piatra-Neamt, energetically rehabilitated with Swiss non-reimbursable funds
49
Comentează